Ship production occurs at the end of a complex process and needs effective and efficient Project Management (PM). Uncertainty in project management parameters always exists and is inevitable. The Fuzzy Set Theory is capable of capturing uncertainty through the membership functions of the parameters. We proposed a model of Interval Type-2 Fuzzy Sets (IT2FSs) Program Evaluation and Review Technique (PERT) method to literature and applied this to the production scheduling of an electric yacht to study this proposed method in terms of PM in the shipbuilding industry. The proposed model contains Forward Pass and Backward Pass calculations for IT2FPERT with a new ranking method, and a Slack Time calculation for IT2FPERT, which develops a Criticality Degree (CD) on the possible path for IT2FPERT and determines the Critical Path. Robustness tests of the proposed model were carried out by comparing results to the Critical Path Method (CPM), PERT, and PERT Simulation solutions.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Interval type-2 fuzzy program evaluation and review technique for project management in shipbuilding


    Contributors:
    Akan, Ercan (author) / Bayar, Sibel (author)

    Published in:

    Ships and Offshore Structures ; 17 , 8 ; 1872-1890


    Publication date :

    2022-08-03


    Size :

    19 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown




    Shipbuilding & Conversion Review

    Online Contents | 2013


    Commission shipbuilding program

    Engineering Index Backfile | 1944



    Shipbuilding Information Infrastructure Project (SHIIP)

    Rando, T. / McCabe, L. | British Library Conference Proceedings | 1999


    War shipbuilding program

    Land, E.S. | Engineering Index Backfile | 1943