Abstract For long-span cable-stayed bridges, the stability performance during construction is vital from the point view of structural safety. This paper presents an extensive study of stability performance during construction for the world longest steel truss deck cable-stayed bridge-Yachihe Bridge. Based on the finite element analysis, the Linear Elastic Stability (LES), Nonlinear Elastic Stability (NLES) and Nonlinear Inelastic Stability (NLIES) of the bridge have been investigated to identify the effects of geometry nonlinearity and material nonlinearity on the structural stability performance. In addition, the influences of temperature variations and static lateral winds on stability performance are also focused. The results show that: 1) Under design ambient temperature, the corresponding design of steel truss deck yields the minimum stability coefficients of LES, NLES and NLIES by 5.72, 4.64 and 2.96, respectively, corresponding to the completion of superimposed dead loads; 2) both the geometry nonlinearity and material nonlinearity have been identified to make negative effects on the stability performance and the material nonlinearity will reduce the structural stability coefficient largely; 3) during construction, the rise and drop in temperature will increase and decrease the stability coefficients, respectively. NLIES is the most sensitive one to variations of temperature; and 4) the lateral static winds slightly reduce the stability coefficients of LES, NLES and NLIES.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    A Stability Study of the Longest Steel Truss Deck Cable-stayed Bridge during Construction


    Contributors:

    Published in:

    Publication date :

    2019-01-21


    Size :

    8 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English




    A Stability Study of the Longest Steel Truss Deck Cable-stayed Bridge during Construction

    Yu, Xiang-min / Chen, De-wei / Bai, Zhi-zhou | Online Contents | 2019


    The open steel deck cable-stayed bridge

    Knox, H. S. G. / Walther, F. | British Library Conference Proceedings | 1994


    Steel truss girder cable-stayed bridge initial internode installation mode

    YANG CHENGHONG / LIU JINGHONG / ZHANG SIMENG et al. | European Patent Office | 2021

    Free access


    Hoisting device and hoisting method for steel truss girder sections of steel truss girder cable-stayed bridge

    ZHANG YONG / ZENG HAO / WU MIN et al. | European Patent Office | 2024

    Free access