An Army Preliminary Evaluation of the preproduction OV-1D airplane (Mohawk), S/N 67-18899, was conducted by the US Army Aviation Systems Test Activity. During the period of this test, 33.9 hours were flown between 29 April 1969 and 14 May 1969 at Calverton, New York. The objective of this test was to evaluate performance and handling qualities of the airplane in various external store configurations.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Army Preliminary Evaluation II. Production OV-1D (Mohawk) Performance Addendum

    G. M. Yamakawa / K. H. Brauer / W. A. Graham et al. | NTIS | 1972


    Army Preliminary Evaluation II Production OV-1D (Mohawk) Performance and Handling Qualities

    G. M. Yamakawa / W. A. Graham / K. H. Brauer et al. | NTIS | 1971


    Mohawk, the Mohawk "Pinto."

    Engineering Index Backfile | 1928


    Mohawk, the Mohawk "Pinto."

    Engineering Index Backfile | 1928