An Army Preliminary Evaluation of the preproduction OV-1D airplane (Mohawk), S/N 67-18899, was conducted by the US Army Aviation Systems Test Activity. During the period of this test, 33.9 hours were flown between 29 April 1969 and 14 May 1969 at Calverton, New York. The objective of this test was to evaluate performance and handling qualities of the airplane in various external store configurations.
Army Preliminary Evaluation Preproduction OV-1D (Mohawk)
1970
129 pages
Report
No indication
English
Aircraft , Vertical takeoff aircraft , Performance(Engineering) , Aerial reconnaissance , Climbing , Landing , Stall warning indicators , Accelerometers , External stores , Stability , Side looking radar , Infrared scanning , Airborne , Radar jamming , Flight speeds , Aircraft engines , Lift , Acceleration , Acceptability , An/alq-80 , An/alq-67 , An/aps-94 , An/aps-94(D) , Ov-1d aircraft , V-1 aircraft
Engineering Index Backfile | 1928
Engineering Index Backfile | 1928
Military: Tiger preproduction agreed
Online Contents | 1997