Abstract The problem of optimizing the service along an existing two-track rail line by adopting a zone-stop schedule during the peak periods is investigated. A dynamic programming technique is employed to determine the number of zones, the stations that belong to each zone, the headway between trains to the same zone and the fleet size. The general objective of the analysis is to minimize the total transportation cost, defined as the sum of the costs of time to the passengers and the relevant rail capital and operating costs. The optimization problem is subject to several constraints including avoidance of train conflicts, limitations on the value of the headway and an available fleet size. The applicability of the model is demonstrated through a numerical example using field data.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Optimum zone structure during peak periods for existing urban rail lines


    Contributors:


    Publication date :

    1984-08-15


    Size :

    12 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English



    Planning of Urban Freight Delivery During Peak and Off-Peak Traffic Periods

    Hriekova, Olesia / Galkin, Andrii / Schlosser, Tibor et al. | Springer Verlag | 2024


    Optimum Urban Clear Zone Distance

    Sax, Christian R | Online Contents | 2010


    Optimum Urban Clear Zone Distance

    Sax, Christian R. / Maze, Thomas H. / Souleyrette, Reginald R. et al. | Transportation Research Record | 2010


    Coordinative Passenger Flow Control during Peak Hours in Urban Rail Stations

    Wang, Lili / Yan, Xuedong / Zhang, Yuting | ASCE | 2015