New bulk coal discharging installation at Wm. Cory and Son depot on River Thames; installation comprises prestressed concrete jetty, suitable for use by ships of up to 14,000 tons displacement, grabbing cranes, facilities for road and rail traffic, turntable and electrically operated feeder hoppers; jetty is L-shaped, straight approach arm consisting of eight bays of 50-ft span and jetty head comprising 22 bays of 25-ft span; information on materials and construction method; diagrams.
Prestressed concrete jetty at Erith
Dock Harbour Authority
Dock and Harbour Authority ; 39 , n 462
1959
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1905
TIBKAT | 1948
|