Underbridge erected to carry Hammersmith and City Railway over Ladbroke Grove; main girders constructed of plates of varying thicknesses; joints made by double-vee butt welds; deck composed of heavy section 10-in. and 8-in. joists at 1-ft 8-in. centers; advantages claimed in connection with this type of work as against riveted work; general arrangement.
All-welded underbridge in West London
Ry Gaz
Railway Gazette and Railway News ; 69 , n 25
1938
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Long-welded rail train for London transport
Engineering Index Backfile | 1961
Engineering Index Backfile | 1937
Engineering Index Backfile | 1937
Atmospheric pollution measurements in West London (1973)
TIBKAT | 1976
|The effect of speed cameras in West London
British Library Conference Proceedings | 1993
|