1–50 of 78 hits
|

    MILCON P-547 Power and Propulsion Facility

    Young, William / Chang, Yuwei / Barnhart, Michael | TIBKAT | 2019

    Design, Testing, and Construction of a Wave Energy Absorbing Quay Wall

    Wesson, Mauricio A. / Cox, Jack C. | TIBKAT | 2019

    Sediment Cleanup Challenges in the Fast Waterway

    Berlin, Dan / Wang, Tom / Ketteridge, Kathy et al. | TIBKAT | 2019

    Unique Wharf Upgrade to Diversify Operations for Larger RO/RO Shipments and New Containerized Cargo

    Watson, Nathan / Bergman, Adam / Klekotka, John et al. | TIBKAT | 2019

    Replacement of a Floating Dock for Passenger Ferries

    Walter, Catrina / Wernli, Markus / Linke, Jake et al. | TIBKAT | 2019

    Seismic Design of Anchored Bulkheads: The Structural Design Perspective

    Jain, Pooja / SDB, Task Committee | TIBKAT | 2019

    Seismic Performance of Pile-Supported Piers and Wharves Subjected to Foundation Deformations

    Souri, Milad / Khosravifar, Arash / Dickenson, Stephen et al. | TIBKAT | 2019

    Geotechnical Considerations for Development of a Fireboat Station at the Port of Long Beach

    Varatharaj, Raj S. / Pratheepan, Pratheep K. / Lai, Cheng et al. | TIBKAT | 2019

    Overview of the San Francisco Seawall Earthquake Safety Program

    Reel, S. / Wickens, M. / Iwashita, R. | TIBKAT | 2019

    Seismic Fragility and Risk Assessment of Waterfront Structures at the Port of San Francisco

    Johnson, G. S. / Seligson, H. A. / Pyun, J. J. et al. | TIBKAT | 2019

    Wharf Structure Design Consideration of Pier E Redevelopment Project at the Port of Long Beach

    Jaradat, Omar / Lai, Cheng / Richards, Theresa et al. | TIBKAT | 2019

    An Integrated Assessment of Seismic Hazard Vulnerability and Resilience of Seaports

    Hur, Jieun / Shafieezadeh, Abdollah / Chen, Zhenhua | TIBKAT | 2019

    Port of Long Beach Marine Maintenance Dock Facilities at Pier D, Berth 48, Project

    Aguilar, Joel / Lai, Cheng / Tuladhar, Prabin et al. | TIBKAT | 2019

    Combined Kinematic and Inertial Seismic Analysis of Marine Structures

    Galbraith, J. A. / Naeem, M. A. / Bruin, W. M. | TIBKAT | 2019

    Seismic Analysis and Ground Improvement Design for the PCT Marine Terminal at the Port of Alaska

    Christie, Samuel / Zhang, Yu / Dickenson, Stephen et al. | TIBKAT | 2019

    Upcoming Changes to ASCE/COPRI 61-19 Chapter on Ancillary Components

    King, Brett W. / Johnson, Gayle S. | TIBKAT | 2019

    Drone: The New Point and Shoot Camera; Using Drones to Enhance Waterfront Inspection and Design

    Marcotte, David / Riden, Kirk / Levesque, Eric et al. | TIBKAT | 2019

    Redevelopment of an 1880 Banana Export Terminal

    Bardi, John / Malla, Ajaya / Ortiz, Ramses Lobo | TIBKAT | 2019

    Influence of Dynamic Behavior of Soft Clay on Seismic Pier Response at the Port of San Francisco

    Serna, Benjamin / Dickenson, Stephen E. / Rudolph, R. William et al. | TIBKAT | 2019

    Decommissioning of SR520 Floating Bridge, Seattle, WA

    Naeem, M. A. / Iversen, R. / Yao, S. X. | TIBKAT | 2019

    Repair of a Deteriorated Timber Seawall at the Port of Los Angeles, Berth 240 A, B, C

    Sanchez, Marco A. / Zavichi, Amir / Pan, Mahsa et al. | TIBKAT | 2019

    The Port of Los Angles Wilmington Waterfront Promenade: “A Window to the Waterfront"

    Cisneros, Hugo / Jaradat, Omar / Chrisco, Zachary et al. | TIBKAT | 2019

    Seismic Retrofit of an Existing MOT Using Float-In Construction for Rapid Turnaround

    Percher, Marc / Iwashita, Rod / Pratheepan, Pratheep K. et al. | TIBKAT | 2019

    Seismic Performance and Rehabilitation of the Port of Manta after the 2016 Ecuador Earthquake

    Rojas, Pedro / Miranda, Eduardo / Barros, Jose et al. | TIBKAT | 2019

    Land Reclamation and Settlement of Reclaimed Land for New Ports

    Leung, Chun F. / Lam, James P. W. / Salim, El F. et al. | TIBKAT | 2019

    Seismic Design of Anchored Bulkheads: The Geotechnical Perspective

    Anderson, Monique A. / SDB, Task Committee | TIBKAT | 2019

    Geotechnical and Structural Challenges: New Seattle Multimodal Terminal at Colman Dock Project

    Bayrak, M. Birkan / Mikhail, Reda / Wray, Mike et al. | TIBKAT | 2019

    Precast, Prestressed Concrete Floating Berth at the Haines Ferry Terminal

    Firat, Yeliz / Yang, Frank / Phan, Vu et al. | TIBKAT | 2019

    Performance Based Seismic Retrofit Solutions for Wharf Preservation

    Yao, Sam / Naeem, M. Ali / Barrett, Sara et al. | TIBKAT | 2019

    Leveraging BIM Tools to Coordinate and Design a Navy Pier Extension

    Schilling, T. J. / Rygel, Justin | TIBKAT | 2019

    Use of Physical/Numerical Modeling in Design of an Exposed Quay at Port of Ashdod

    Bayram, Atilla / Paparis, Bill / ONeil, Sean et al. | TIBKAT | 2019

    Precast Construction or Upgrade/Expansion of Two Operating Solid Bulk Terminals in Colombia

    Sircar, Jyotirmoy / Ospina, Carlos E. / Forero, Miguel et al. | TIBKAT | 2019

    General Berthing Pier Replacement at Naval Base San Diego

    Dahl, Henrik / Connolly, James / Sanchez, Alberto | TIBKAT | 2019

    Extending the Service Life of Mooring Cells

    Usselton, Zachary J. | TIBKAT | 2019

    Establishing a Rational Inspection Criteria for Composite Materials Used in Waterfront Structures

    Iversen, Rune / Bruin, William M. / Argo, Maximo L. et al. | TIBKAT | 2019

    Target Reliability Indices for Quay Walls, Jetties, and Flexible Dolphins

    Roubos, Alfred A. / Peters, Dirk Jan / Steenbergen, Raphael D. J. M. | TIBKAT | 2019

    Wharf Upgrade Considerations for Large Low Profile Cranes

    Bhimani, Arun / Dix, Anna / Gentil, Claude | TIBKAT | 2019

    Wharf Improvements for New Panamax Size Vessels

    Stehmeyer, Edward H. III / Petereit, Ralph | TIBKAT | 2019

    Upgrade of Berths 226-236, Container Wharf Terminal at the Port of Los Angeles

    Lim, Angel / Sanchez, Marco / Correa, Brian et al. | TIBKAT | 2019

    A Look into Premature Failure of Vertically Welded Pipe Piles

    Teeden, Matthew L. / Harris, Lukian A. | TIBKAT | 2019