41–60 of 78 hits
|

    Influence of Dynamic Behavior of Soft Clay on Seismic Pier Response at the Port of San Francisco

    Serna, Benjamin / Dickenson, Stephen E. / Rudolph, R. William et al. | TIBKAT | 2019

    Decommissioning of SR520 Floating Bridge, Seattle, WA

    Naeem, M. A. / Iversen, R. / Yao, S. X. | TIBKAT | 2019

    Repair of a Deteriorated Timber Seawall at the Port of Los Angeles, Berth 240 A, B, C

    Sanchez, Marco A. / Zavichi, Amir / Pan, Mahsa et al. | TIBKAT | 2019

    The Port of Los Angles Wilmington Waterfront Promenade: “A Window to the Waterfront"

    Cisneros, Hugo / Jaradat, Omar / Chrisco, Zachary et al. | TIBKAT | 2019

    Leveraging BIM Tools to Coordinate and Design a Navy Pier Extension

    Schilling, T. J. / Rygel, Justin | TIBKAT | 2019

    Use of Physical/Numerical Modeling in Design of an Exposed Quay at Port of Ashdod

    Bayram, Atilla / Paparis, Bill / ONeil, Sean et al. | TIBKAT | 2019

    Precast Construction or Upgrade/Expansion of Two Operating Solid Bulk Terminals in Colombia

    Sircar, Jyotirmoy / Ospina, Carlos E. / Forero, Miguel et al. | TIBKAT | 2019

    General Berthing Pier Replacement at Naval Base San Diego

    Dahl, Henrik / Connolly, James / Sanchez, Alberto | TIBKAT | 2019

    Extending the Service Life of Mooring Cells

    Usselton, Zachary J. | TIBKAT | 2019

    Establishing a Rational Inspection Criteria for Composite Materials Used in Waterfront Structures

    Iversen, Rune / Bruin, William M. / Argo, Maximo L. et al. | TIBKAT | 2019

    Seismic Retrofit of an Existing MOT Using Float-In Construction for Rapid Turnaround

    Percher, Marc / Iwashita, Rod / Pratheepan, Pratheep K. et al. | TIBKAT | 2019

    Seismic Performance and Rehabilitation of the Port of Manta after the 2016 Ecuador Earthquake

    Rojas, Pedro / Miranda, Eduardo / Barros, Jose et al. | TIBKAT | 2019

    Land Reclamation and Settlement of Reclaimed Land for New Ports

    Leung, Chun F. / Lam, James P. W. / Salim, El F. et al. | TIBKAT | 2019

    Seismic Design of Anchored Bulkheads: The Geotechnical Perspective

    Anderson, Monique A. / SDB, Task Committee | TIBKAT | 2019

    Geotechnical and Structural Challenges: New Seattle Multimodal Terminal at Colman Dock Project

    Bayrak, M. Birkan / Mikhail, Reda / Wray, Mike et al. | TIBKAT | 2019

    Precast, Prestressed Concrete Floating Berth at the Haines Ferry Terminal

    Firat, Yeliz / Yang, Frank / Phan, Vu et al. | TIBKAT | 2019

    Performance Based Seismic Retrofit Solutions for Wharf Preservation

    Yao, Sam / Naeem, M. Ali / Barrett, Sara et al. | TIBKAT | 2019