1–4 of 4 hits
|

    Tie-renewal revolution on Santa Fe

    The railroad gives Fairmont Tamper management responsibility for tie renewal, surfacing and equipment maintenance
    Tuzik, Bob | IuD Bahn | 1995
    Contributors: Generalni reditelstvi Ceskych drah

    Ballast operations are on the move

    New approaches and new equipment have advanced the industry's use of ballast cleaning and undercutting
    Tuzik, Bob | IuD Bahn | 1995
    Contributors: Generalni reditelstvi Ceskych drah

    A mainline first: BN's 30-hour bridge replacement

    Faced with two options, BN chose the unthinkable: It shut down a segment of the mainline to provide one large window for a bridge replacement.
    Tuzik, Bob | IuD Bahn | 1995
    Contributors: Generalni reditelstvi Ceskych drah

    Trends for fastening systems in the U.S.

    Along with wider acceptance of resilent fasteners, the market is seeing premium systems for wood ties.
    Tuzik, Bob | IuD Bahn | 1995
    Contributors: Generalni reditelstvi Ceskych drah