With the development of the high-speed railway (HSR) and metro, the metro crossing the HSR in operation usually happened in metropolis. Considering the stability of railway bridge foundation is very critical to the safety of HSR in operation, it is very important to monitor the influence of the construction of metro tunnel. The no.6 metro line of Nanjing city is crossing the railway bridge group, including three HSR lines, Beijing-Shanghai HSR, Nanjing-Anqing intercity railway, and Shanghai-Wuhan-Chengdu railway. A real-time deformation system using sensors with high accuracy and wireless network is designed to monitor the bridge piers, which are adjacent to the metro tunnel and may be affected in the bridge group. The tilt and settlement of bridge piers and horizontal displacement of pier head are considered in this system. The monitoring results show the feasibility of the system and grantee the operation and bridge engineerings safety.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Deformation Monitoring of Railway Bridge Group Influenced by Construction of Metro Tunnel



    Published in:

    Applied Mechanics and Materials ; 405-408 ; 1810-1814


    Publication date :

    2013-09-03


    Size :

    5 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English




    Deformation Monitoring of Railway Bridge Group Influenced by Construction of Metro Tunnel

    Shi, Liang-Hong / Feng, Chuan-Bao / Zhang, Tong-Gang et al. | Tema Archive | 2013



    Performance of Metro Railway, Kolkata

    Kasinath, Sopan | IuD Bahn | 2014


    Metro Railway Kolkata: a glimpse

    Kumar, Vinod | IuD Bahn | 2002