Considering the demand of night train on Beijing-Guangzhou high-speed railway, two modes of segmented rectangular maintenance time window are discussed. Methods to make train operation plans under these two modes are proposed, aiming at shortening the train waiting time and making the departure and arrival time more reasonable. Comparing the new designed train operation plans with the original one under the vertical rectangular maintenance time window, it shows that segmented rectangular maintenance time window is better in night train operation.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    The Study of Train Operation Plan of Night Train on Beijing-Guangzhou High-Speed Railway under Segmented Rectangular Maintenance Time Window



    Published in:

    Publication date :

    2014-01-16


    Size :

    5 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English





    Benefit Analysis of Wuhan-Guangzhou High-Speed Railway Train Operation Plan

    Gu, Jlgr Xuefei / Yan, Haifeng / Tan, Xue | TIBKAT | 2020



    Allocation Plan of Night Trains on Beijing-Guangzhou High-Speed Railway

    Sun, Shi Zhao ;Han, Bao Ming ;Zhang, Qi | Trans Tech Publications | 2015


    Allocation Plan of Night Trains on Beijing-Guangzhou High-Speed Railway

    Sun, S. Z. / Han, B. M. / Zhang, Q. et al. | British Library Conference Proceedings | 2015