An upgrading exercise may take place under three circumstances. It may be a straightforward communications upgrade where there is already an existing 30 pair cable in situ. It may be carried out as part of a road widening contract when the communications are also re-equipped with a new cable infrastructure and new equipment. It may be an interim upgrade which takes place when an existing 20 pair installation is to be temporally used to operate a restricted NMCS2 service. These three possibilities are dealt with.
Upgrading from NMCS1 to NMCS2 (motorway control systems)
Die Fortentwicklung des Verkehrslenkungssystems NMCS1 zum System NMCS2
1991
Conference paper
English
The A1 motorway upgrading in yorkshire, england
British Library Conference Proceedings | 2003
|Motorway signal and control systems
Tema Archive | 1993
|A Motorway-to-Motorway Control Results of a Simulation Study
British Library Conference Proceedings | 1997
|Motorway traffic control system
Tema Archive | 1984
|Motorway networks, modelling and control
Automotive engineering | 1991
|