A general temporal constraint reasoner and a set of mechanisms for deriving temporal information from airlift requirements and partial schedule specifications have been developed. Temporal reasoning provides a general mechanism integrating various types of temporal constraints on airlift events to provide time bounds on execution of the complete plan. Physical limitations of the aircraft and operating facilities and the availability of cargo produce constraints on when certain events may occur. Constraints include the time required to fly from one location to another, or the time spent waiting for an aircraft to be loaded. Comparing cargo requirements with airlift capacity over time provides additional constraints. By considering these constraints and their interactions, the planner is in a better position to assess the impact of high-level planning decisions. Deliberate planning for airlift operations consists of an iterated cycle of resource allocation, simulation, and analysis. This project deals only with deliberate planning.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Temporal reasoning for airlift scheduling analysis


    Additional title:

    Zeitliche Schlußfolgerung für die Luftbrücken Scheduling-Analyse


    Contributors:
    Clay, J.D. (author) / Wellman, M.P. (author) / Bisbee, C.R. (author)


    Publication date :

    1990


    Size :

    5 Seiten, 11 Quellen


    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Distributed scheduling and temporal reasoning

    WEISSER, JR., PAUL / HOWIE, RANDY | AIAA | 1989


    Analysis of Consolidated vs. Coordinated Operational Support Airlift Scheduling

    B. Brykczynski / R. E. Entlich / M. R. Kappel et al. | NTIS | 1996


    Aircraft and Crew Scheduling during Airlift Operations

    R. D. Armstrong / A. Charnes / S. Samn | NTIS | 1981



    Priority dispatch and aircraft scheduling: a study of strategic airlift scheduling

    Armstrong, G.R. / Coleman, J.W. / Hamilton, V.H. et al. | Tema Archive | 1983