Based on Dalian subway line 2 from Chun-guang street station to Xiang-gong street station, the three dimensional finite element model was established using FLAC3D software, the shield excavated surface against the pressure, the stress release, the shield tail escape and grouting. The numerical result indicated that the pipeline displacement increases gradually with the advance of the tunnel excavation. When one-sided tunnel excavation is carried out, the largest displacement is located at the tunnel axis, the settling curve basically conforms to the normal distribution curve with the unimodal characteristic. The excavation of right-side tunnel is disadvantageous to the left-side tunnel. The analysis indicated that the pipeline is in a secure state. The work in this paper provided theoretical basis and the practical guidance to this project.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Numerical Study on the Effect of Twin-Tube Shield Excavation on Adjacent Pipelines


    Contributors:
    Wang, Xin (author) / Zhao, De-Shen (author) / Xu, Meng-Lin (author)


    Publication date :

    2012


    Size :

    6 Seiten




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Reliability Analysis of Underground Pipelines Subject to Disturbance of Shield Tunnel Excavation

    Zhang, Q. / Yang, C.-y. / Cheng, Q.-f. et al. | British Library Conference Proceedings | 2007




    The Influence of Non-synchronous Excavation of Twin Curved Shield Tunnels

    Li, Shaohua / Huang, Changfu / Yao, Tiejun et al. | Springer Verlag | 2022