Through the use of inverted emulsion drilling fluid, wellbore stability problems have been reduced in drilling from Beryl 'A' platform. In addition, torque and drag reduction have resulted - improving the process of directional drilling. Cementing volumes have been reduced and cementing success improved. Specially designed and fabricated equipment prepares the cuttings for discharge to the sea and completely processes the mud to maximize its utility. (Kursetz)
How using oil mud solved north sea drilling problems
Loesung von Bohrproblemen bei Nordsee-Bohrinseln durch Verwendung von Oelschlamm
European offshore petroleum conf. and exhibition, Earls Court ; 1 , Oct ; 291-300
1978
10 Seiten, 4 Bilder, 3 Tabellen, 1 Quelle
Conference paper
English
Christmas crackers - Gift problems solved
Online Contents | 1999
How carbureter problems are solved
Engineering Index Backfile | 1910
Field problems solved by cheap power
Engineering Index Backfile | 1933
Solved practical problems in transportation engineering
TIBKAT | 2021
|Aerospace machining problems solved by technology
Online Contents | 1998