Abstract Since more elements are involved in the construction projects, the decision making process of Resource-constrained Project Scheduling Problems (RCPSP) cannot be determined by a manager, but multiple level decision makers. This study focuses on the RCPSP in a practical grounding grid system project in Jin’ An Qiao hydropower station, which consider the hierarchical organization structure and hybrid uncertainty environment simultaneously. In this practical RCPSP, the construction contractor is the Upper Level Decision Maker (ULDM), while the outsourcing partner is the Lower Level Decision Maker (LLDM). Considering the operations difficulties and practical decision making process in the RCPSP, a bi-level multi-objective RCPSP model with bi-random coefficients is developed. To deal with the bi-random variables in the model, the Dependent-Chance Programming (DCP) method is introduced and the equivalent crisp model is derived. Subsequently, motivated by the particular nature of model, Bi-level Global-local-neighbor Particle Swarm Optimization Algorithm (BGLN-PSO) is designed to obtain the optimal schedule for grounding grid system project. A practical application is presented to verify the efficiency of proposed bi-level multi-objective RCPSP model and algorithm.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    A multi-objective DCP model for bi-level resource-constrained project scheduling problems in grounding grid system project under hybrid uncertainty


    Contributors:
    Zhang, Zhe (author) / Liu, Ming (author) / Zhou, Xiaoyang (author) / Chen, Lu (author)

    Published in:

    Publication date :

    2015-10-09


    Size :

    11 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English





    Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling

    Liu, Wanlin / Ge, Li / Qu, Chunli et al. | Springer Verlag | 2024


    Resource constrained project scheduling by harmony search algorithm

    Giran, Omer / Temur, Rasim / Bekdaş, Gebrail | Online Contents | 2017


    Resource constrained project scheduling by harmony search algorithm

    Giran, Omer / Temur, Rasim / Bekdaş, Gebrail | Springer Verlag | 2017


    Improved and competitive algorithms for large scale multiple resource-constrained project-scheduling problems

    Rostami, Mohammad / Moradinezhad, Dariush / Soufipour, Azadeh | Springer Verlag | 2014