The decision to use static, dynamic, additive, or subtractive delay analysis is critical because making the wrong decision may have serious undesired consequences. As a response to this problem, a delay analysis selection (DAS) model was developed that identifies the most appropriate type of delay analysis for a target case. The model constitutes the first step of a two-step process to perform delay analysis. It involves a case-base that is populated by 3,776 possible cases developed by using combinations of 26 attributes that were found in the literature to influence the selection of the most appropriate type of delay analysis. The 26 attributes were organized in 7 categories. The weights of the attributes and the categories were calculated using the entropy method. The DAS model finds the best match between a target case and one of the cases stored in the case-base by performing weighted case similarity assessment. The type of delay analysis that is indicated in the matched case is adopted for use in the target case. This study is the first attempt to automate the selection of the most appropriate type of delay analysis. Once the most suitable type of delay analysis is identified in the first step, it is immediately performed in the second step.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Delay Analysis Selection Model for a Construction Project


    Additional title:

    KSCE J Civ Eng


    Contributors:

    Published in:

    Publication date :

    2022-12-01


    Size :

    16 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English





    Project Delivery Selection Matrix for Highway Design and Construction

    Tran, Dai Q. / Harper, Christofer M. / Molenaar, Keith R. et al. | Transportation Research Record | 2013


    Assessment of Construction Project Contractor Selection Success Factors considering Their Interconnections

    Naji, Khalid K. / Gunduz, Murat / Falamarzi, Mohammad H. | Springer Verlag | 2022


    Project Quality Assurance Organization Selection for Highway Design and Construction Projects

    Kraft, Elizabeth / Molenaar, Keith R. | Transportation Research Record | 2013


    A competency model for project construction team and project control team

    Lee, Tai Sik / Kim, Du-Hwan / Lee, Dong Wook | Springer Verlag | 2011