Large-span steel truss cable-stayed bridge largely appears in railway bridge construction in China, so it is very essential to find a method to help engineers and designers carry on calculation of continuous welded rail (CWR) on this kind of bridge easily. Two simplified models and algorithms were proposed, and a software BCWR was built up based on the algorithms. To validate algorithms above are feasible, take the truss steel cable-stayed bridge of “5×32m simple beam +(36+96+228+96+36)m steel truss beam+5×32m simple beam” for example, a bridge-rail interaction plane model was established, which could embody all structural characteristics, such as steel truss, stay cable, main tower. Rail additional longitudinal forces and the bridge-rail displacements obtained based on finite element method (FEM), and those obtained based on two algorithms above were compared mathematically. Results show that distribution regularities of the additional forces and the bridge-rail displacements obtained by FEM are the same as those obtained by the algorithms. So these two simplified algorithms can both satisfy the CWR design on this kind of bridge, and are very efficient and effective.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Simplified Algorithms for Continuous Welded Rail Design on Large-Span Steel Truss Cable-Stayed Bridge


    Additional title:

    Lect. Notes Electrical Eng.


    Contributors:
    Ni, Yi-Qing (editor) / Ye, Xiao-Wei (editor) / Zhao, Weihua (author) / Wang, Ping (author) / Cao, Yang (author)


    Publication date :

    2012-01-01


    Size :

    6 pages





    Type of media :

    Article/Chapter (Book)


    Type of material :

    Electronic Resource


    Language :

    English




    Simplified Algorithms for Continuous Welded Rail Design on Large-Span Steel Truss Cable-Stayed Bridge

    Zhao, W. / Wang, P. / Cao, Y. | British Library Conference Proceedings | 2012


    Steel truss girder cable-stayed bridge initial internode installation mode

    YANG CHENGHONG / LIU JINGHONG / ZHANG SIMENG et al. | European Patent Office | 2021

    Free access

    Key Design and Construction Techniques for Collisionproof Steel Cofferdam for Large Span Cable-Stayed Bridge

    Li, Wei-Zhou / Feng, Zhong-Ju / Hu, Zhong-Chao et al. | Tema Archive | 2012


    Truss type wheel-rail bridge deck crane and large-span steel box bridge construction method

    CHEN XIAOMING / ZHANG YU / ZHENG XIANGJIE et al. | European Patent Office | 2021

    Free access

    Hoisting device and hoisting method for steel truss girder sections of steel truss girder cable-stayed bridge

    ZHANG YONG / ZENG HAO / WU MIN et al. | European Patent Office | 2024

    Free access