A method is proposed to determine objectively where track or a railway system should be reprofiled to control corrugation. The method includes criteria that are pertinent to corrugation in different wavelength ranges. It has been applied successfully over eight years on one tram system. Measurements also illustrate how it could have been applied to a metro line. Examples of ‘track memory’ are given insofar as corrugation remains more or less fixed even after reprofiling.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    A practical methodology to prioritise reprofiling sites for corrugation removal


    Contributors:
    Grassie, SL (author)


    Publication date :

    2020-04-01


    Size :

    8 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English