Since 1979 work has progressed in the development of the Hubble Space Telescope (HST) mockup. Underwater simulations to evaluate proposed on-orbit servicing tasks have also been done. These tasks involve the planned changeout of scientific instruments and the unscheduled changeout of other orbital replacement units (ORUs) such as batteries and computers. The HST components and subsystems that originally were designated ORUs were the items that were mission critical and were designed for easy changeout. Mockups of 14 non-ORU items were designed and fabricated for the purpose of evaluating the EVA changetasks in the MSFC Neutral Buoyancy Simulator (NBS). The objectives of this design/fabrication/test activity were to design and fabricate the potential ORUs so they contained realistic interfaces and were compatible with the NBS environments. The attachment of the mockup hardware to the spacecraft mockup was similar to the flight version. Also, the hardware connectors were flight-like.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Development of Space Telescope Non-ORU Hardware


    Contributors:

    Publication date :

    1985


    Size :

    37 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Development of space telescope non-ORU hardware

    Robertson, K. B. / Henderson, D. E. | NTRS | 1985


    Electric hardware system design for the Space Solar Telescope

    Sun, Caihong / Geng, Lihong / Jin, Shengzhen et al. | Tema Archive | 2003




    Space telescope

    Pruett, E. C. / Robertson, K. B. / Vanvalkenburg, C. N. et al. | NTRS | 1983