A full aero-thermal calibration of the NASA Glenn Icing Research Tunnel (IRT) was completed in 2012 following the major modifications to the facility that included replacement of the refrigeration plant and heat exchanger. The calibration test provided data used to fully document the aero-thermal flow quality in the IRT test section and to construct calibration curves for the operation of the IRT.
Aero-Thermal Calibration of the NASA Glenn Icing Research Tunnel (2012 Tests)
2013
126 pages
Report
No indication
English
AIAA-2001-0233 Aero-Thermal Calibration of the NASA Glenn Icing Research Tunnel (2000 Tests)
British Library Conference Proceedings | 2001
|