A total of forty-one injector development test firings were made using eight injector configurations. Three chamber lengths were evaluated with a single injector configuration. Satisfactory performance was achieved with the longest chamber tested. Injector dynamic stability was demonstrated in numerous stability rating tests. Three demonstration injectors were designed and fabricated and two of these injectors were subjected to checkout firings.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Injector/Chamber Scaling Feasibility Program. Volume 1. Design and Short Duration Testing


    Contributors:

    Publication date :

    1970


    Size :

    279 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Injector/Chamber Scaling Evaluation

    R. A. Silver | NTIS | 1972


    Injector/Chamber Scaling Evaluation-TRW Injector Development

    B. R. Bornhorst / M. F. Powell / D. A. Grimes et al. | NTIS | 1969


    Injector/Chamber Scaling Evaluation, Facility Checkout

    M. F. Powell / P. W. Powell / M. J. Fleiszar et al. | NTIS | 1969



    The Effect of Injector Design on Thrust- Chamber Erosion

    R. W. Rowley / W. H. Tyler | NTIS | 1966