The costing approach, methodology, and rationale utilized for generating cost data for composite IUS and space tug orbital operations are discussed. Summary cost estimates are given along with cost data initially derived for the IUS program and space tug program individually, and cost estimates for each work breakdown structure element.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Ius/Tug Orbital Operations and Mission Support Study. Volume 5: Cost Estimates


    Publication date :

    1975


    Size :

    184 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English