The south suburban freeway is to be a multi-lane, median divided, fully access controlled facility approximately thirty miles in length. A reduction in noise pollution should be felt through the South Suburban area by a substantial number of people. On the other side the relatively fewer residents in proximity to the Freeway might experience an increase in noise. A diminishing and disruptive effect of constructing the freeway over presently undeveloped or agricultural land cannot be denied.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Proposed Federal-Aid Route 433 (South Suburban Freeway), Will and Cook Counties, Illinois


    Publication date :

    1972


    Size :

    93 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English