The STS-68 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the sixty-fifth flight of the Space Shuttle Program and the seventh flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-65; three SSMEs that were designated as serial numbers 2028, 2033, and 2026 in positions 1, 2, and 3, respectively; and two SRBs that were designated BI-067. The RSRMs that were installed in each SRB were designated as 360W040A for the left SRB and 360W040B for the right SRB. The primary objective of this flight was to successfully perform the operations of the Space Radar Laboratory-2 (SRL-2). The secondary objectives of the flight were to perform the operations of the Chromosome and Plant Cell Division in Space (CHROMEX), the Commercial Protein Crystal Growth (CPCG), the Biological Research in Canisters (BRIC), the Cosmic Radiation Effects and Activation Monitor (CREAM), the Military Application of Ship Tracks (MAST), and five Get-Away Special (GAS) payloads.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    STS-42 Space Shuttle mission report

    Fricke, Robert W. | NTRS | 1992


    STS-35 Space Shuttle mission report

    Camp, David W. / Germany, D. M. / Nicholson, Leonard S. | NTRS | 1991



    STS-72 Space Shuttle Mission Report

    Fricke, Robert W., Jr. | NTRS | 1996


    STS-78 Space Shuttle Mission Report

    R. W. Fricke | NTIS | 1996