本发明公开了一种电厂煤棚钢结构件安装方法,所述方法包括以下步骤:S01、预先在地面将杆件和球头组成预安装组件;S02、使用钢结构件运输装置将预安装组件运送到待安装处下方地面上;S03、使用吊绳两端分别固定预安装组件的中需要安装在上部的2根杆件,并确保吊绳将预安装组件悬吊起来时2根杆件能够保持水平;S04、将预安装组件悬吊到待安装处,抓住预安装组件的其中两根杆件,通过所述两根杆件调整预安装组件姿态,使预安装组件上的杆件端部螺杆对准待安装处对应的球头螺孔;S05、将杆件端部螺杆固定在待安装处对应的球头螺孔上。以解决现有技术施工效率较低、需要吊车数量较多的问题。

    The invention discloses an installation method for a coal shed steel structural part of a power plant. The installation method comprises the following steps that S01, rod parts and a ball head form a pre-installation assembly on the ground in advance; S02, a steel structural part conveying device is used for conveying the pre-installation assembly to the ground below a to-be-installed position; S03, the two rod parts, needing to be installed on the upper portion, in the pre-installation assembly are fixed through the two ends of a lifting rope respectively, and it is ensured that the two rod parts can be kept horizontal when the pre-installation assembly is suspended through the lifting rope; S04, the pre-installation assembly is suspended to the to-be-installed position, two rod parts of the pre-installation assembly are grasped, the posture of the pre-installation assembly is adjusted through the two rod parts, and screw rods at the ends of the rod parts on the pre-installation assembly are made to be aligned with corresponding ball head screw holes in the to-be-installed position; and S05, the screw rods at the ends of the rod parts are fixed to the ball head screw holes corresponding to the to-be-installed position. The problems that in the prior art, construction efficiency is low, and the number of needed cranes is large are solved.


    Access

    Download


    Export, share and cite



    Title :

    一种电厂煤棚钢结构件安装方法


    Publication date :

    2024-07-05


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B66C Krane , CRANES / E04G SCAFFOLDING , Baugerüste