Problem is to determine if warrant for traffic signal control can be established for intersection of main street and minor street, by using relation between availability of gaps in traffic stream on main street and lag and/or gap acceptance by drivers on minor street; as basis for such warrant, gap utilization at intersection is determined; four examples are given; gap utilizations obtained agreed in at least first two decimal places with given analytic solutions; for multidistribution gap problem, simulation may very well be only way to obtain reasonably accurate values if nearly total blocking does not occur within platoons.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    On gap utilization


    Additional title:

    Traffic Eng


    Contributors:
    Ehle, B.L. (author)

    Published in:

    Publication date :

    1967


    Size :

    6 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English





    HYDROGEN UTILIZATION METHOD AND HYDROGEN UTILIZATION SYSTEM

    SAKAGUCHI KATSUNORI | European Patent Office | 2021

    Free access

    VEHICLE UTILIZATION SYSTEM AND VEHICLE UTILIZATION METHOD

    YASUDA NAOTO / HIROSE MINESHI / OSHITANI YUKI et al. | European Patent Office | 2019

    Free access

    HYDROGEN UTILIZATION METHOD AND HYDROGEN UTILIZATION SYSTEM

    SAKAGUCHI KATSUNORI | European Patent Office | 2021

    Free access

    Technology utilization

    Kubokawa, C. C. | NTRS | 1978