Plans and sectional drawings showing the methods of construction, with an account of the difficulties which have been met in the work. (1200 w.)
Construction of the new dry-dock at the Skinner shipyard, Baltimore
Marine Engng
1901
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The new skinner and eddy shipyard
Engineering Index Backfile | 1916
|Shipyard adopts deck-high outfitting dock
Engineering Index Backfile | 1943
Ore-unloading dock at Baltimore
Engineering Index Backfile | 1951
Engineering Index Backfile | 1901