Discussion of factors, of aerial and technical construction character, influencing design of airport; after careful planning, entire work was executed in three months; hangars, shop, chalet, and auxiliary buildings are described.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Albacete Airport


    Additional title:

    El aerodrome de Albacete


    Contributors:
    Sanz, A.B. (author)

    Published in:

    Publication date :

    1929


    Size :

    4 pages


    Remarks:

    3 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    Spanish


    Keywords :