The R&D project aimed at optimizing ship inspection processes to minimize costs. This was done by numerically optimizing a related mathematical model. When the project was started, such methods were partly available but could only be applied to certain significantly idealized subtasks. Within the project a stochastic cost model was used to optimize the inspection strategy. This model was based on simulation of crack propagation and reliability analysis ...
Rationalisierung von Inspektionsstrategien II : Abschlußbericht zum Vorhaben MTK 0556 8 des Bundesministerium für Bildung, Wissenschaft, Forschung und Technologie (BMBF)
[Electronic ed., rev. 1.28]
1997
142 p. = 1,32 MB, text and images
nIndex
Differences between the printed and electronic version of the document are possible
Digital preservation by Technische Informationsbibliothek (TIB) / Leibniz-Informationszentrum Technik und Naturwissenschaften und Universitätsbibliothek
Report
Electronic Resource
German