Optimizing the maintenance scheduling of metro systems is a crucial task that necessitates meticulous coordination of labor, equipment, and workspaces to ensure optimal system performance and safety. A mathematical model and a two-stage teaching-learning-based optimization (TLBO)-resource operators crossover (ROC) algorithm are proposed aiming at optimizing the scheduling of maintenance tasks for metro systems. The mathematical model focuses on minimizing the makespan, which represents the total duration or time required to complete a set of tasks or activities within a project. In addition, it takes into account the need to balance the load on labor and workspaces, considering environmental constraints, limited resources, and strict scheduling requirements. A two-stage TLBO-ROC algorithm is specifically designed to enhance the scheduling process. It achieves this by iteratively updating the local best individual matrix, dividing it into groups, and adjusting the resource allocation. This algorithm effectively reduces the makespan while also achieving improved balance in the workspace load. The model and algorithm are tested on the Shenzhen metro system. Experimental results demonstrate that our proposed approach significantly reduces the makespan. In comparison to manual scheduling plans, the algorithm achieved a remarkable 28.06% reduction in the makespan. Moreover, when compared to benchmark algorithms, our proposed algorithm not only improves the makespan but also ensures more equitable occupation of workspaces by maintaining a similar balance in labor load.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Research on Optimization of Maintenance Task Scheduling for Metro Systems Based on Resource Constraints


    Weitere Titelangaben:

    Transportation Research Record: Journal of the Transportation Research Board


    Beteiligte:
    Luo, Qin (Autor:in) / Huang, Shan (Autor:in) / Li, Wei (Autor:in) / Wang, Yi (Autor:in) / Zeng, Cuifeng (Autor:in) / Chen, Jingjing (Autor:in)


    Erscheinungsdatum :

    2024-06-06




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Risk-Based Maintenance Optimization of Metro Vehicle Door System

    Guo, Xiang / Pan, Lisha / Jia, Limin et al. | Tema Archiv | 2014


    Scheduling Optimization of Prefabricated Buildings under Resource Constraints

    He, Wei / Li, Wenjing / Meng, Xiaofeng | Springer Verlag | 2021


    Task-resource scheduling problem

    Gorbenko, A. / Popov, V. | British Library Online Contents | 2012


    COMBINED AIRCRAFT MAINTENANCE ROUTING AND MAINTENANCE TASK SCHEDULING

    SAFAEI NIMA | Europäisches Patentamt | 2016

    Freier Zugriff

    Integrated optimization approach to metro crew scheduling and rostering

    Zhou, Jue / Xu, Xiaoming / Long, Jiancheng et al. | Elsevier | 2021