A multistage process for evaluating the workload of a five-minute segment of flight including approach and landing for a typical transport aircraft was described. The goal of the analysis was to compare the workload of the two pilots. Four types of measurement techniques were suggested: Analytic (a preliminary task and time line analysis identified task requirements and target performance levels); Performance (flight path control, communications, and interval production); Physiological (heart rate and heart rate variability); and Subjective ratings (a multidimensional technique developed at NASA Ames).


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Measurement of pilot workload


    Beteiligte:


    Erscheinungsdatum :

    1987-06-01


    Medientyp :

    Sonstige


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Measurement of Pilot Workload

    E. S. Stein / B. L. Rosenberg | NTIS | 1983


    Pilot Workload Prediction

    Pepitone, David D. / Bortolussi, Michael R. / Shively, Robert J. | SAE Technical Papers | 1987


    Assessing pilot workload

    NATO, Flight Mechanics Panel / NATO, Advisory Group for Aerospace Research and Development | TIBKAT | 1978


    Studies on Pilot Workload

    R. Auffret | NTIS | 1977


    Pilot workload monitoring system

    RUWE MATTHEW NEIL / SALAME MICHAEL CAMILLE | Europäisches Patentamt | 2021

    Freier Zugriff