This manual provides preliminary operating and maintenance instructions for erection of the XSM-65 B, C, and D series missiles in the tower, with holddown and release cylinders installed on the launcher. The missile and the attached trailer are erected in the tower as a unit; the trailer mates with the erector, and the missile mates with the launcher. Erection is concerned with the operation of all equipment required to raise and hold the missile in the launching position. (Author)
Preliminary Operating and Maintenance Instructions for Erecting Missile in Tower (With 7-89366 Holddown and Release Cylinders Installed on the Launcher)
1959
18 pages
Report
Keine Angabe
Englisch
Missile Technology , Construction Equipment, Materials, & Supplies , Missile Launching & Support Systems , Surface to surface missiles , Guided missile launchers , Instruction manuals , Positioning devices(Machinery) , Transporter erectors , Release mechanisms , Launching sites , Alignment , Theodolites , Guided missile safety , Sequences(Mathematics) , Operation , Atlas , Xsm-65c missiles , Xsm-65b missiles , Xsm-65d missiles
Payload Holddown and Release Mechanism
NTIS | 1994
|Payload holddown and release mechanism
NTRS | 1994
|Payload Holddown and Release Mechanism
British Library Conference Proceedings | 1994
|Pyroshock Tests on Solar Array Holddown and Release System
British Library Conference Proceedings | 2001
|