Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.
Ius/Tug Orbital Operations and Mission Support Study. Volume 4: Project Planning Data
1975
39 pages
Report
Keine Angabe
Englisch
Orbital Operations Study. Volume 1 Mission Analysis
NTIS | 1972
|Magellan mission planning and orbital operations
NTRS | 1991
|Magellan Mission Planning and Orbital Operations
NTIS | 1991
|