A Life Cycle Cost/Cost Benefit Analysis based on a ten year period has been conducted on the Microwave Comunications Subsystem of the Enhanced Airport Security System Project at Baltimore-Washington International Airport (BWI). The Life Cycle Cost of the subsystem is estimated at $49,073, as compared with a baseline system cost of $0. The primary benefit of this subsystem is in an increased level of airport and personnel safety.
FAA Technical Center Enhanced Airport Security System Project: Microwave Communications Subsystem Cost Benefit Analysis
1994
32 pages
Report
Keine Angabe
Englisch