A system includes a signal system controller electrically connected to a first track section of a first rail of a track system, and electrically connected to a second track section of the first rail, in which the first track section is separated from the second track section by a first rail insulated joint. The signal system controller is configured to transmit a test signal on the first track section and configured to receive the test signal on the second track section to test the first rail insulated joint between the first track section and the second track section.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    System and method employing joint bypass circuit to test insulated joints in track systems


    Beteiligte:
    CHURCH BENJAMIN (Autor:in) / WYATT BARTON (Autor:in) / MELTON DARREN (Autor:in)

    Erscheinungsdatum :

    2017-06-27


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Englisch


    Klassifikation :

    IPC:    G01R Messen elektrischer Größen , MEASURING ELECTRIC VARIABLES / B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC



    Track circuit signals without insulated joints

    Engineering Index Backfile | 1909


    System and method for testing insulated joints in track systems

    CHURCH BENJAMIN / WYATT BARTON / MELTON DARREN | Europäisches Patentamt | 2020

    Freier Zugriff

    SYSTEM AND METHOD FOR TESTING INSULATED JOINTS IN TRACK SYSTEMS

    CHURCH BENJAMIN / WYATT BARTON / MELTON DARREN | Europäisches Patentamt | 2016

    Freier Zugriff

    SYSTEM AND METHOD FOR TESTING INSULATED JOINTS IN TRACK SYSTEMS

    CHURCH BENJAMIN / WYATT BARTON / MELTON DARREN | Europäisches Patentamt | 2023

    Freier Zugriff

    Insulated track circuit

    WEN SHULAI / ZHANG LEI / XIE LONG et al. | Europäisches Patentamt | 2024

    Freier Zugriff