Simultaneously considering train scheduling problem and maintenance planning problem with uncertain travel time, we propose a two-stage integrated optimization model for the sunset-departure and sunrise-arrival trains (SDSA-trains). Specifically, in the first stage, we obtain an optimal solution of the SDSA-trains under each scenario, which leads to the minimum total travel time. In the second stage, a robust SDSA-train schedule is generated based on the optimal solutions of the first stage. The key is that we consider two operation modes to solve the conflict between the SDSA-trains and the maintenances. Some state variables are used to deal with train operation mode selection. Furthermore, some linearization techniques are used to formulate a mixed-integer linear programming (MILP) model. Finally, numerical experiments are implemented to prove the effectiveness of the proposed model and optimization method.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Robust Train Scheduling Problem with Optimized Maintenance Planning on High-Speed Railway Corridors: The China Case


    Beteiligte:
    Chuntian Zhang (Autor:in) / Yuan Gao (Autor:in) / Wenjie Li (Autor:in) / Lixing Yang (Autor:in) / Ziyou Gao (Autor:in)


    Erscheinungsdatum :

    2018




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    Integrated Overnight Train Scheduling and Maintenance Planning for High-Speed Railway Lines

    Wang, Dian / Zhan, Shuguang / Peng, Qiyuan et al. | Transportation Research Record | 2020





    Integrated multi-track station layout design and train scheduling models on railway corridors

    Qi, Jianguo / Yang, Lixing / Gao, Yuan et al. | Elsevier | 2016