Synonyme wurden verwendet für: Lebenszeitkosten
Suche ohne Synonyme: keywords:(Lebenszeitkosten)

1–20 von 58 Ergebnissen
|

    Reducing Lifecycle Sustainment Costs

    Berteau D. J. | NTIS | 2015
    Schlagwörter: Life cycle costs

    Army Helicopter Cost Drivers

    H. K. Reddick | NTIS | 1975
    Schlagwörter: Life cycle costing

    Appropriations, Congress & Budget Execution 'Color of Money 101'

    B. Hebert | NTIS | 2011
    Schlagwörter: Life cycle costs

    Avionics. Operational Flight Program. Integrated Support Plan

    NTIS | 1978
    Schlagwörter: Life cycle costs

    Designing Adaptable Ships: Modularity and Flexibility in Future Ship Designs

    J. F. Schank / S. Savitz / K. Munson et al. | NTIS | 2016
    Schlagwörter: Life cycle costs

    Improving Defense Acquisition Insights from Three Decades of Rand Research Summary

    J. P. Wong / O. Younossi / C. K. Lacoste et al. | NTIS | 2022
    Schlagwörter: Life cycle costs

    Analysis of Contractor Logistics Support for the P-8 Poseidon Aircraft

    S. Tallant / M. Martin / S. Hedrick | NTIS | 2008
    Schlagwörter: Life cycle costs , Personnel life cycle costs

    System to Integrate Unmanned Undersea Vehicles with a Submarine Host Platform

    W. Calvert / G. Goodman / J. Lojek et al. | NTIS | 2011
    Schlagwörter: Life cycle costs

    Cost Growth Mid to Late 1960s

    NTIS | 2001
    Schlagwörter: Life cycle costs

    Next Generation Integrated Power System: NGIPS Technology Development Roadmap

    N. Doerry / K. McCoy | NTIS | 2007
    Schlagwörter: Life cycle costs

    Maritime Patrol Airship Study (MPAS)

    D. B. Bailey / H. K. Rappoport | NTIS | 1980
    Schlagwörter: Life cycle costs

    Air Force Journal of Logistics. Volume 5, Number 1, Winter 1981

    NTIS | 1981
    Schlagwörter: Life cycle costs

    Enterprise Command and Control Requirements and Common Architecture on US Navy Surface Combatants

    E. Acosta / A. Maurseth / J. Barta et al. | NTIS | 2009
    Schlagwörter: Life cycle costs

    Survey of Maritime Experiences in Reduced Workload and Staffing

    C. C. Baker / T. Malone / R. D. Krull | NTIS | 1999
    Schlagwörter: Life cycle costs

    Concurrent Engineering: Spacecraft and Mission Operations System Design

    J. A. Landshof / R. J. Harvey / M. H. Marshall | NTIS | 1994
    Schlagwörter: Life cycle costs