1–14 von 14 Ergebnissen
|

Ihre Suche:
keywords:(Bergbau)

    Calculator programs guide directionally drilled wells through tangled Thums lease

    Clark, D.D. / Barth, J.W. | Tema Archiv | 1983
    Schlagwörter: TIEFBOHREN (BERGBAU)

    PC-based program automates drilling planning and design

    Tema Archiv | 1998
    Schlagwörter: Bohrung (Bergbau)

    Dynamic analysis as an aid to the design of marine risers

    Young, R. / Fowler, J. / Fisher, E. | Tema Archiv | 1977
    Schlagwörter: BOHREN (BERGBAU)

    Neural network applications to upscale core data and ancient logs to petrophysical parameters of flow units, Caro field, Eastern Venezuela

    Alfonso, Q.P. / Roberto, B.Q. | Tema Archiv | 1998
    Schlagwörter: Bohren (Bergbau) , Bohrung (Bergbau)

    A navigation system for automated loaders in underground mines

    Larsson, Johan / Broxvall, Mathias / Saffiotti, Alessandro | Tema Archiv | 2006
    Schlagwörter: Halde (Bergbau)

    Program integrates pressure loss for single and two-phase pipelines

    Awoseyin, R.S. | Tema Archiv | 1986
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Personal computer application of well test analysis techniques

    Akin, S. / Kok, M.V. | Tema Archiv | 2002
    Schlagwörter: Bohrung (Bergbau)

    CAD system used for major offshore project

    Burton, J.C. / Finley, C.R. / Faulkner, J.R. | Tema Archiv | 1986
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Vehicle control of unmanned dump trucks

    Okawa, Y. / Nagai, T. / Murayama, O. et al. | Tema Archiv | 1992
    Schlagwörter: Bergbau

    Rechnergesteuerte Streckenfoerderanlage im Eisenerzbergwerk Kiruna

    Oeberg, R. | Tema Archiv | 1980
    Schlagwörter: FOERDERUNG (BERGBAU)

    A multi-echelon multi-commodity, logistic system design at the Dead Sea Works Ltd

    Rabinowitz, G. / Mehrez, A. | Tema Archiv | 2001
    Schlagwörter: Bergbau

    New control strategies for longwall armored face conveyors

    Broadfoot, A.R. / Betz, R.E. | Tema Archiv | 1998
    Schlagwörter: Bergbau