Optimisation and analysis of lock gates in the frameworkof the 'Seine-Escaut-Est' waterway upgrading
Parallel motion fenders: Some design considerations, including the immersion of fender cones
Climate change mitigation and adaptation measures for inland waterways in England and Wales
Stourport basins restoration — Maintaining and building heritage for the future
Refurbishment and reconstruction of the South Hook LNG Import Terminal Jetty
The Elbe-Lübeck-Canal: A short navigation link from the seas into the inland
Concrete armour units for breakwaters : A study on the structural integrity