Synonyme wurden verwendet für:
Beschaffung
Suche ohne Synonyme:
keywords:("Beschaffung")
Standard Spacecraft Procurement Analysis: A Case Study in NASA-DOD Coordination in Space Programs
Standard Spacecraft Economic Analysis. Volume 2: Findings and Conclusions
Standard Spacecraft Economic Analysis. Volume 1: Executive Summary
Standard Avionics Packaging, Mounting, and Cooling Baseline Study
Space Transportation: Nasa Has No Firm Need for Increasingly Costly Orbital Maneuvering Vehicle
Space Launch Vehicles: Government Activities, Commercial Competition, and Satellite Exports
SpaceCRAF: A Civil Reserve Air Fleet for Space-Based Capabilities
Solving Warfighter Capability Requirements through Venture Capital
Small Purchases at Defense Logistics Agency Organization
Small Diameter Bomb Increment II (SDB II) as of Fiscal Year 2017 President's Budget
Should the United States Army Procure the Total Quantity of Black Hawk elicopters it Requires
Selling to NASA (National Aeronautics and Space Administration)
Selected Effects of Contractor Reactions to Standardization of Avionics Acquisitions
Security Assistance and National Security in the Global Economy
Search for an Advanced Fighter: A History from the XF-108 to the Advanced Tactical Fighter
Satellite Acquisition: Global Positioning System Acquisition Changes After Challenger's Accident
Road to Hypersonic Weapons: Technical Challenges and Emerging Opportunities
RIM-AIR (Repairable Integrated Model for Aviation) Study
Review of Air Force's Next Generation Trainer Aircraft Program Department of Defense
Review of Air Force/Navy Spare Aircraft Engine Requirements Methodology
Returning RDT and E Assets (Aircraft) to Operational Usage
Results in Brief: Mi-17 Overhauls Had Significant Cost Overruns and Schedule Delays
Research and Development Procurements - Marketing Practices and Problems
Requirement: Cost Effective Development of New Army Aviation Systems
Report of the Analysis of the Joint Medium Range Air to Surface Missile Program
Reliability program management guide. Final rept. Dec 72-Jul 73
Reduced Performance and Increased Cost Warrant Reassessment of the Multiple Stores Ejector Rack