81–100 von 1,333 Ergebnissen
|

Ihre Suche:
keywords:(Risk)

    Optimal Helicopter Trajectory Planning for Terrain Following Flight

    P. K. A. Menon | NTIS | 1990
    Schlagwörter: Risk

    Wind tunnel study of wake downwash behind A 6% scale model B1-B aircraft

    J. H. Strickland / E. L. Tadios / D. A. Powers | NTIS | 1990
    Schlagwörter: Risk Assessment

    SDIO Electric Propulsion Requirements

    R. J. Vondra / L. H. Caveny | NTIS | 1990
    Schlagwörter: Risk

    Impact of Icing on Unmanned Aerial Vehicle (UAV) Operations

    R. A. Siquig | NTIS | 1990
    Schlagwörter: Risk

    Development of a 1/7th Scale Fighter UAV for Flight Research

    D. M. Lee | NTIS | 1990
    Schlagwörter: Risk

    Mission Safety Evaluation Report for STS-40, Postflight Edition

    W. C. Hill / S. I. Finkel | NTIS | 1991
    Schlagwörter: Risk

    Autonomous Rendezvous and Capture Development Infrastructure

    T. C. Bryan / F. Roe / C. Coker et al. | NTIS | 1991
    Schlagwörter: Risk

    Brake Lock Mechanism for the Two Axis Pointing System

    A. Posey / M. Clark / L. Mignosa | NTIS | 1991
    Schlagwörter: Risk

    Space Station Freedom/Lunar Transfer Vehicle Propellant Operation Hazard Analysis

    S. Dominick / S. M. Stevenson / H. Feingold | NTIS | 1991
    Schlagwörter: Risk

    A simulation model for risk assessment of turbine wheels

    Safie, F.M. / Hage, R.T. | Tema Archiv | 1991
    Schlagwörter: RISK EVALUATION

    Dual-Purpose Self-Deliverable Lunar Surface PV Electrical Power System

    J. H. Arnold / D. W. Harris / E. R. Cross et al. | NTIS | 1991
    Schlagwörter: Risk

    Operational Survey: VFR Heliport Approaches and Departures

    R. A. Syms / R. A. Wiedemann | NTIS | 1991
    Schlagwörter: Risk

    Review of DOD's Strategic Mobility Programs: Civil Reserve Air Fleet

    L. Schwartz / A. H. Beyer / F. M. McNamee et al. | NTIS | 1991
    Schlagwörter: Risk

    Safety questions relevant to nuclear thermal propulsion

    D. Buden | NTIS | 1991
    Schlagwörter: Risk Assessment