Multiple urban projects constructed at same time block many roads, which increases the difficulty for traffic organization. Considering the characteristics of multiple projects, took construction method, construction procedure, land development, traffic environment and traffic flow into account, this paper proposes a workflow for traffic organization, recommends building temporary road and reconstructing branch road to undertake all the traffic from blocked roads. Selecting Jiangcheng Avenue complex project as a case, four methods were put forward for keeping traffic uninterrupted during construction with different temporary road route designs and traffic management measures.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Operative Methods for Traffic Organization during Multiple Projects



    Erschienen in:

    Applied Mechanics and Materials ; 361-363 ; 2339-2343


    Erscheinungsdatum :

    2013-08-08


    Format / Umfang :

    5 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Co-operative freight traffic

    Post, Alfred H. | Engineering Index Backfile | 1909


    Traffic Management for Major Traffic Projects During Construction

    Fu, J. / Huijun, H. | British Library Conference Proceedings | 1994


    SYSTEM OF OPERATIVE REGULATION OF TRAIN TRAFFIC

    KUZMIN VLADISLAV SERGEEVICH / MERKULOV PAVEL MIKHAJLOVICH | Europäisches Patentamt | 2021

    Freier Zugriff

    Methods and practice of traffic simulation evaluation for traffic construction projects

    Luo, Tian / Duan, Zhong yuan / Luo, Jun shao et al. | British Library Conference Proceedings | 2022


    Methods and practice of traffic simulation evaluation for traffic construction projects

    Luo, Tian / Duan, Zhong yuan / Luo, Jun shao et al. | SPIE | 2022