This paper summarizes the design of open-cut subway station in Chengdu Metro line one. The station is built by cut and cover method and divided into three special parts with four different cross-sections used for main line and transfer track. Such retaining techniques as bored piles, steel pipe struts, soil nails, rock-bolts, steel-meshes, shotcrete and anchored steel cables are comprehensively used to maintain the stability of foundation pit. The anti-buoyancy coefficient of the open cut station is also derived and attains the requirement of safety and stability for the foundation pit after the utilization of these enclosure measures. The application of the design and construction technique for the subway station may provide guidance for the building of analogous subway station under similar geological and hydrogeological conditions in Chengdu.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Design of Enclosure for Subway Station Foundation Pit in Southward Extension Line of Chengdu Metro Line One


    Beteiligte:
    Zhou, Xiao-Jun (Autor:in) / Wang, Jing-He (Autor:in) / Hu, Hong-Yun (Autor:in)


    Erscheinungsdatum :

    2013


    Format / Umfang :

    4 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch





    Passenger Volume of the Chengdu Metro Line 1 Analysis

    Xiao, Jingwen / Li, Hui | ASCE | 2011


    Gas Monitoring: Methane and Hydrogen Sulfide - Metro Red Line Subway System

    Edelson, A. C. / American Public Transit Association | British Library Conference Proceedings | 1997


    Kyoto subway projects and extension of Tozai Line

    Kubota, Toshikazu | IuD Bahn | 2006


    The Strategy of Chengdu Metro Management and Development

    Zeng, Rongdi / Yao, Ying / Cheng, Bo | ASCE | 2011