Ramp metering (RM) has been deployed in more than 80 locations on the Highways Agency (HA) motorway network. Evaluation of operational sites shows average journey time reductions of 13% (3). Experience gained during the installation, calibration and operation of the first 30 sites suggested that further benefits could be generated from the ramp metering system by further development of certain aspects of the system algorithms. This paper details the four key proposed algorithm developments and the expected performance improvements as suggested by detailed modelling work (1).


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Development of algorithms to improve ramp metering system in England


    Beteiligte:
    Higginson, R. (Autor:in) / Hayden, J. (Autor:in) / Charton, T. (Autor:in) / Ubhi, S. (Autor:in)


    Erscheinungsdatum :

    2010


    Format / Umfang :

    6 Seiten, 5 Quellen


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Development of Algorithms to Improve Ramp Metering System in England

    Higginson, R. / Hayden, J. / Charton, T. et al. | British Library Conference Proceedings | 2010


    Ramp Metering

    Gordon, Robert | Springer Verlag | 2016


    Comparative Analysis of Operational Algorithms for Coordinated Ramp Metering

    Kwon, Eil / Nanduri, Sreemannarayan / Lau, Rich et al. | Transportation Research Record | 2001



    Comparative Analysis of Operational Algorithms for Coordinated Ramp Metering

    Kwon, E. / Nanduri, S. / Lau, R. et al. | British Library Conference Proceedings | 2001