In a time of growing inflation on top of budget cutbacks, builders of big weapon systems are looking for new ways to cut costs. One technique that grumman aerospace corp. Found successful in developing the navy's ea-6b electronic warfare aircraft is now established procedure at this big bethpage, n.Y. Aerospace firm.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Pre-installation engineering cuts costs on military systems


    Beteiligte:
    Mason, J.F. (Autor:in)

    Erschienen in:

    Electronic Design ; 19 , 17 ; 24-25


    Erscheinungsdatum :

    1971


    Format / Umfang :

    2 Seiten, 2 Bilder


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Seismic Retrofit Cuts Installation Costs

    British Library Online Contents | 1993


    Seismic Retrofit Cuts Installation Costs

    British Library Online Contents | 1993


    Value Engineering Cuts Bridge Costs

    British Library Online Contents | 1997


    Systems KLM cuts middleware costs

    British Library Online Contents | 2004


    Confrontation cuts Costs

    Hartley, J. / Mortimer, J. | Tema Archiv | 1973