This report presents a survey of track renewal machines and track renewal systems in Europe and North America. Topics covered include a brief history of track renewal, traditional North American selective track maintenance, and each of the major track renewal machine types currently in use. Emphasis is given to the Canron P-811-based system: p-811 operations are described in detail, including direct observations of the machines operating in Italy and on the Northeast Corridor. Also included are reviews of three recent studies of the economics of track renewal systems for U.S. railroads. The studies used different scenarios and therefore produced different results. However, each study did forecast a positive rate of return on the investment required for track renewal systems to replace selective maintenance methods. The report concludes with a brief account of each of the seven major issues that affect the economics of track renewal but that have yet to be studied in detail.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Track renewal systems: a survey report


    Weitere Titelangaben:

    Gleisrueck- und Gleisbaumaschinen: Eine Uebersicht


    Beteiligte:
    Cataldi, G.R. (Autor:in) / Elkaim, D.N. (Autor:in) / Larsen, K.W. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1979


    Format / Umfang :

    27 Seiten


    Medientyp :

    Report


    Format :

    Print


    Sprache :

    Englisch




    Delivering track renewal

    Wiseman, Paul | IuD Bahn | 2005



    Assembly line track renewal

    Wiemann, Ingo | IuD Bahn | 2002


    Track renewal gets scientific

    Abbott, Jame | IuD Bahn | 2006


    NR steps up track renewal

    Cordner, Ken | IuD Bahn | 2005