Indonesia has many areas dominated by clay soils. Including in Bontang city, East Kalimantan. This research focuses on malls and hotel projects located at that location. Regarding the construction in this project, there is a case of foundation pile shifting due to several factors, including the soil embankment factor. It causes additional loads outside the design of the foundation pile and the clay soil type factor with high moisture content and plasticity, as well as the impact load factor caused by the driving machine foundation pile. So, an analysis of the foundation piles before and after the addition of the load was carried out using the p-y curve method to find the maximum lateral load. It focuses on the Mall and Hotel project in Bontang, which is shifting pile due to additional loads such as soil embankment and driving machine pile. The two analyses will be compared and searched for the two piles’ lateral bearing capacity and can later improve the case or prevent similar cases in other projects. The main result is maximum lateral load (3.436 Ton), additional lateral loads (8.157 Ton), so the conclusion is the pile cannot hold the lateral loads.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Analysis of Shift Pile Foundation on Mall and Hotel Projects in Bontang, East Kalimantan


    Weitere Titelangaben:

    Lecture Notes in Civil Engineering


    Beteiligte:
    Lie, Han Ay (Herausgeber:in) / Sutrisna, Monty (Herausgeber:in) / Prasetijo, Joewono (Herausgeber:in) / Hadikusumo, Bonaventura H.W. (Herausgeber:in) / Putranto, Leksmono Suryo (Herausgeber:in) / Joshua, Nicholas (Autor:in) / Susilo, Alfred Jonathan (Autor:in)


    Erscheinungsdatum :

    2022-02-01


    Format / Umfang :

    12 pages





    Medientyp :

    Aufsatz/Kapitel (Buch)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch







    ANALISA KEKUATAN KONSTRUKSI BRACKET TOWING HOOK PADA TB. BONTANG DENGAN METODE ELEMEN HINGGA DAN RULES BKI

    Imam Pujo Mulyatno / Berlian Arswendo A / Muhammad Alan | DOAJ | 2013

    Freier Zugriff

    MALL

    YOKOTA KAZUYOSHI / MATSUBARA HARUTO / NAKANO TOMOKI et al. | Europäisches Patentamt | 2015

    Freier Zugriff