Building construction in India is carried out using conventional materials like concrete but it has limitation of span and size of components. As a result, large span areas that are essentially required for housing Electrical Extra High Voltage Gas Insulated Switchgears could not be covered by simple frames and required complex frame arrangements thereby increasing the required completion time. For design, steel has been the preferred material because of its ductile, strength, flexible, recyclability nature and low cost. With technology transfers, entrepreneurs had established steel centres where entire design to production is carried under one roof and the product is erected at site. These factories had given advantage of fabricating components either ahead or parallel to the civil works at site, thus saving time. Introducing the concept of Pre-Engineered building (PEB) into structural design resulted in design optimization and many advantages, including economy and easier fabrication when compared with the Conventional Steel building (CSB). PEB construction is widely gaining popularity over regular conventional buildings in India due to its sheer advantage in time saving. However, there is a challenge of proper and optimized design suiting to the Electrical Substation requirements such as pressurized atmospheric environment, Maintenance walkways, entry of electrical Bus ducts at various levels and locations. Any overlooking of the above may lead to overall failure of the electrical system. This would make it unique from the normal conventional PEB buildings done for Ware houses, Factories, etc.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Pre-Engineered Building Design of Gas-Insulated Substation Housed Under Pressurized Ventilation


    Weitere Titelangaben:

    Lecture Notes in Civil Engineering


    Beteiligte:
    Das, Bibhuti Bhusan (Herausgeber:in) / Nanukuttan, Sreejith V. (Herausgeber:in) / Patnaik, Anil K. (Herausgeber:in) / Panandikar, Neena Shekhar (Herausgeber:in) / Roopesh, N. (Autor:in) / Swamy, K. A. (Autor:in) / Das, Bibhuti Bhusan (Autor:in)


    Erscheinungsdatum :

    2020-11-24


    Format / Umfang :

    12 pages





    Medientyp :

    Aufsatz/Kapitel (Buch)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Pre-Engineered Building Design of Gas-Insulated Substation Housed Under Pressurized Ventilation

    Roopesh, N. / Swamy, K. A. / Das, Bibhuti Bhusan | TIBKAT | 2021


    SEALED, HEAT-INSULATED VESSEL HOUSED IN A BUOYANT STRUCTURE

    BLEOMELEN MAEL / JOLIVET PIERRE / PETITPAS MATTHIEU et al. | Europäisches Patentamt | 2017

    Freier Zugriff

    Pressurized air ventilation method

    SUN XIAOLIANG / HU SIPING / WANG RONG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Pressurized ventilation for shell tankers

    Engineering Index Backfile | 1953


    Intelligent assisting platform for gas insulated substation (GIS) dismounting

    HU ZHENHUA / CHEN YUEWEI / FAN LIXIN et al. | Europäisches Patentamt | 2016

    Freier Zugriff