The need for clear definition of accuracy performance and operating criteria for Load Indicating Systems has been voiced by crane operators, crane manufacturers, and legislative agencies. A thorough study of the existing Recommended Practice was undertaken with the specific goal to upgrade J-376 to permit greater understanding of the minimum performance requirements of Load Indicating Systems.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Load Indicating Systems in Lifting Crane Service - J-376a - A Case Study in the Revision of a Recommended Practice


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Schaner, D. S. (Autor:in) / Parker, G. A. (Autor:in) / Elengo, J. J. (Autor:in) / Six, J. W. (Autor:in) / Griffin, R. F. (Autor:in)

    Kongress:

    1975 SAE International Off-Highway and Powerplant Congress and Exposition ; 1975



    Erscheinungsdatum :

    1975-02-01




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :